Archive for December, 2010

Blog back

December 27, 2010

After a few months of blogging holiday this blog is back.

Obviously the focus will change, we’re not anymore in electoral period, and thanks for that. There will be politics discussed though, and in case you were wondering I’m not anymore a member of any party and this because I don’t feel that there is one party left in Britain that reflects my opinions.

I still think that the Lib Dems are the less bad of the three mainstream parties but I can’t really find it in me to feel associated to creeps like George Osborne, Eric Pickles or Michael Gove.

If Nick Clegg will decide that he has a mandate to veto a few of  these people’s policies then I’ll reconsider.

Courthill Road to get a green man in 2012

December 27, 2010

It’s with immense pleasure that I can report that on 15th December in a written reply to Caroline Pidgeon AM the Mayor of London Boris Johnson outlined the timetable for a green man crossing at Courthill Road.

Courthill Road junction
Question No: 3876 / 2010
Caroline Pidgeon
In answer to a previous question on Courthill Road junction in Lewisham (Question number 2981/2010) you stated: “Traffic modelling and discussions with key stakeholders are continuing to this end, and are scheduled to be completed by the end of this calendar year.” Can you please provide an update as to how far this modelling and discussions has actually progressed and how close Transport for London are to finding more ”radical solutions” as an alternative to providing pedestrian facilities at this junction as requested by current and former ward councillors and many local residents.
Answer from the Mayor
TfL is developing a design proposal for Lewisham High Street at its junction with Courthill Road.  Part of this proposal is to introduce a “green man” pedestrian crossing facility on Courthill Road.  I went out on site with TfL’s Chief Operating Officer London Streets and Heidi Alexander before she became an MP. The traffic modelling is completed and the preliminary design will undergo a road safety audit which is planned to be completed in January 2011.  Consultation on the scheme is planned for early in the New Year.  As the proposals include banning some movements at the Courthill Road junction, with displaced traffic being diverted onto other local roads, feedback from the consultation process will potentially affect not only the final outcome but also the timescales for delivery.  If a viable scheme can be developed, TfL has provisionally programmed detailed design to commence in the summer of 2011 with works commencing early 2012.

This is the result of  the coordinated pressure that residents of Lewisham Central have put onto TfL over a number of years, thanks to all those that helped towards this result. This blog has a Courthill Road tag to read about some of those efforts.

For now, until the traffic lights are actually in place, let’s still cross it with extreme caution, I was almost run over yesterday and the railings on one of the corners have just been replaced after someone smashed into them.